- Bed nozzle replacement,
- Production and assembly of multicyclone cyclonet,
- Manufacturing and assembly of wall pipe armors,
- Production of superheater sheath
- High pressure power plants after the drama
- steam superheater bundle manufacturing,
- Superheating disassembly, assembly and revision processes,
- Superheated elbow sheath manufacturing,
- Superheated elbow changes,
- Water economizer steel cartridge replacement,
- Manufacturing and assembly of air recuperators
- Coal mills revisions,
- Manufacturing and erection of coal transmission lines,
- Manufacture and installation of boiler burners,
- ESP plate renewal,
- Manufacturing and assembly of ESP hammering system,
- Refractory application,
- Superheater manufacturing and assembly,
- Bed nozzle replacement,
- Production and assembly of multicyclone cyclonet,
- Manufacturing and assembly of wall pipe armors,
- Production of superheater sheath